What should I charge for painting work?
Painting is quoted per room, per square foot, or per job — but it is funded by hours, paint, ladders, sprayers, and the prep nobody sees. Price the work from the total hours and materials plus a markup for overhead and profit, then present it as the per-room or per-square-foot price you quote.
Price a job the way contractors actually do it: add up what the job costs you, then add a markup for your overhead and profit. Fill in your numbers — your bid updates as you type.
| Materials & supplies | $0 |
| Your labor (0 hrs × $0) | $0 |
| Hired help | $0 |
| Other direct costs | $0 |
| Your costs (subtotal) | $0 |
| Markup (30% — overhead & profit) | $0 |
| Bid price | $0 |
Pricing method and standard percentages from contractor-industry sources (Angi, Buildern, NAHB): overall contractor markup 20–30%, materials markup 7.5–35%, labor markup 25–50%, recommended profit margin 15–25%. A markup is a percentage of your costs; the resulting margin (share of the bid that's profit) is lower — both are shown above. These are general benchmarks, not a guarantee for your market.
What your markup has to cover
The markup in your bid covers the costs no single job shows. For painting work, your overhead typically includes paint and primer, brushes, rollers, and sprayer upkeep, drop cloths and tape, ladders and scaffolding, the truck and fuel, liability insurance, and dump fees for old paint. None of that appears on one job, but all of it is paid out of the markup added to every job. Published contractor guidance (Angi, NAHB) puts a typical overall markup at 20–30%.
Be realistic about your hours
Prep — taping, patching, sanding, priming — is often half the job and entirely invisible in the finished wall. A "one-day" room can be two days with prep and second coats. Quote off total hours including prep, not just the time with a brush in hand.
Painter pricing FAQs
Should I price painting per hour, per square foot, or per room?
Flat-rate (per room or per job) is usually best, because customers want a firm number and you keep the gains from your own speed. Use your hourly labor rate internally: estimate total hours including prep, multiply, add paint and supplies with markup, and present one price.
How much paint and material markup is normal?
Marking up paint and supplies 20–40% over your cost is standard — it covers the pickup, color matching, and leftover product. Buying contractor-grade paint below retail and charging near retail is a legitimate part of the margin.
Why is prep work so important to my price?
Prep determines how the finish looks and how long it lasts, and it is the most time-consuming part of most jobs. Because prep hours are billable labor like any other, a bid that does not count them separately understates the job.